Aeroplex Group Partners Announces Successful Completion Of $16.8 Million Development Project At Van Nuys Airport

Aeroplex Group Partners — a firm specializing in airport development, project management and aviation consulting — announced on Aug. 26 the completion of a 4.83 acre, $16.8 million development project at Van Nuys Airport (VNY), featuring approximately 62,000 square feet of new energy efficient hangar space and a 544 kilowatt solar rooftop system that supports Los Angeles’ environmental sustainability goals.

Hangar Space (VNY North): With a vision toward the future of business jet designs and the trend to larger business aircraft, this new hangar development is a state-of the-art, full-service, multi-tenant hangar facility. (Image courtesy Aeroplex Group Partners)

 

The new Bonseph VNY North facility, located at Signature Flight Support, will be exclusively occupied by Sun Air Jets and complements their existing operation at VNY – providing exclusive hangar, terminal, office and shop space to meet the dynamic needs of private aviation. Project features include:  

  • Two adjacent, approximately 31,000 square-foot hangars offering 8,400 square feet of attached offices, shops, lounges, restrooms and conference room facilities

  • 77,900-square-feet of new FAA design specified asphalt ramp area constructed with storm water mitigation systems

  • 20,300-square-feet of new asphalt parking lot and landscape areas, including a new airport security fence, gates, and a sizeable airport access control and camera system

  • A 544-kilowatt roof top solar FIT system with 1,280 panels, providing 578 metric tons of new carbon offsets. 

“This project not only fuels the regional economy and creates high-skilled jobs in the community, it improves air quality by meeting California’s green building standards, “ said Aeroplex Group Partner’s Managing Partner Curt Castagna. “Despite the unprecedented challenges posed by the COVID-19 pandemic, our project team adopted protocols to move this project forward and make a meaningful contribution to Los Angeles’ economic recovery efforts.”

Aeroplex Group Partners provided complete project management and oversite, and is responsible for ongoing property management services. Completed in 20 months, from initial concept design to occupancy, the new facility supported approximately 300 trade jobs and created approximately 50 new high-paying technical jobs.

Previous
Previous

2021 Wings Over North Georgia Hybrid Drive-In Air Show Plans Announced

Next
Next

Flying the Largest USAF Airplane